< Case Studies
Case Study
July 17, 2023
Engineering Energy
Detecting developing faults before critical HVAC systems fail
Engineering Energy
Sector
Building services and HVAC
Expertise

Electronic development

Prototyping

Manufacture

Technology

Critical plant monitoring

Early-warning notifications

Website
Sector
Building services and HVAC
Expertise

Electronic development

Prototyping

Manufacture

Technology

Critical plant monitoring

Early-warning notifications

Website

Engineering Energy is a Bristol-based provider of 24-hourcall-out support for commercial caterers, restaurants and data centres. These customers depend on heating, ventilation and air-conditioning (HVAC) systems tokeep their operations running.

‍

THE CHALLENGE

When critical HVAC equipment breaks down, the impact can extend far beyond the repair itself. A failed extraction system can force a commercial kitchen to close, putting pressure on Engineering Energy to restore service as quickly as possible. Regular maintenance cannot eliminate every breakdown.

After finding no suitable off-the-shelf solution,Managing Director Lee Coombes approached Cubik with a concept for a system that would analyse performance and flag developing problems.

‍

THE SOLUTION

Working from Lee's design, we developed, manufactured and demonstrated a prototype critical plant monitoring system. The system was designed to identify potential failures, show when maintenance was required and indicate when filters needed changing.

Engineering Energy installed prototype systems at customer sites for research and development. These field trials provided an opportunity to assess the monitoring system against real operating conditions and identify service issues before they became more disruptive.

‍

THE IMPACT

Within a few months, the prototypes had raised early warnings of several service issues, saving customers money and helping to avoida potential closure. The trials demonstrated the practical value of identifying problems before a complete system failure.

Further development offered the potential for energy savings of 10%. Cubik was selected as the manufacturing partner for the planned product rollout, providing a route from field-tested prototypes to ongoing production.

‍

No items found.
The solution designed by me and developed by Cubik Innovation has been really successful in field testing. It will save time, save system shutdown or failure but more importantly save money.
Lee Coombes
Managing Director

Have you got a project in mind?

Book a free consultation